Which personnel need to be maintained in Shandong Electric Power Industry for the continuation of the qualifications for the continuation of the power of power in the power industry?

3 thoughts on “Which personnel need to be maintained in Shandong Electric Power Industry for the continuation of the qualifications for the continuation of the power of power in the power industry?”

  1. Sending a charged level B qualification personnel equipped with:
    In register to send transmission and transformer. 15 million years
    The second -level structural division 1 80,000 years
    The total map of the senior engineer 1,500,000 years
    One of the budget intermediate engineers for 1,000 years
    In 1,100 years of water drainage intermediate engineers
    The heating intermediate engineer 1 1,000 years

    1. First log in to the competent construction department of the local construction of the enterprise to fill in the qualification application form, and then print the paper documents; 2. Apply to the competent department of the construction department at or above the county level. Department; 3. After the review of the Provincial Department of Construction, the audit opinion will be publicized on the gateway website of the Construction Department;

  2. Hello, the qualification of the transformer B -level B requires 6 registered personnel and 6 non -registered personnel, of which high -power engineering, general map senior workers, and communication high work are dominated by professional performance.

  3. What personnel are needed for transformation and qualification maintenance in Shandong's power industry?
    3 registered transmission and transitions, 100,000 a year, the only social security
    registered 1 first -level structure, 70,000 a year, the only social security.